  • in reply to: CT staturation #11719
    admin
    Keymaster

    thanks a lot 4 the replay

    in reply to: ELECTRICAL INSTALLATION #11714
    admin
    Keymaster

    To Mr. A.Albalooshi

     

    About link talking about Electrical installaions: Electrical Installation Guide

    http://www.electrical-installation.org/

    in reply to: ELECTRICAL INSTALLATION #11712
    admin
    Keymaster

    A.Albalooshi said:

    HI,

        im looking for links or book talking about electrical installation ?


    in reply to: PRACTICAL AND IDEAL TRANSFORMER #11710
    admin
    Keymaster

    i want to multiple choice question of transformer dc motor dc generator speed control etc.

    in reply to: Software for electrical installation #11709
    admin
    Keymaster

    hi i want to know each and every thing about this software but please provide easy access to know and install this software.

    in reply to: Software for electrical installation #11708
    admin
    Keymaster

    I THINK THE SOFTWARE IS A GOOD IDEA, IS IT ALSO APPLICABLE FOR SIMPLE RESIDENTIAL BUILDIND ELECTRICAL DESIGN AND LOAD CALCULATIONS?

    in reply to: what is harmonics? #11705
    admin
    Keymaster

    harmonics is because of presence of undistributed winding in the generator and improper winding design(one conductor under different poles).In the transmission line switching causes harmonics may occur.

    in reply to: Power factor correction kvar policy in countries #11703
    admin
    Keymaster

    Yasin said:

    by the way, my country is Turkey :)

    Now a days in India, in Mumbai distribution APFC's are used to maintain P.F , in RSS depending upon the requirement capacitor banks are installed to improve the pf at transmission level. But due to some industries the power factor reduces which increases line current and some drop in voltage, depending upon the requirement they are charged and discharged. HT consumer's are penalized for the p.f if it goes below 0.98 and a compensation is given if thy maintain p.f more than 0.99.


    in reply to: Software for electrical installation #11702
    admin
    Keymaster

    I'll need a copy of the software, please.

    P.O Box: 566

    Ede, Osun State

    Nigeria.

    Thank you.

    in reply to: ABB Drive 1800 KW capacity #11701
    admin
    Keymaster

    Dear Friend,

    Thanks for the replay,

    IF U don't mind, Can U explain about the above answer. please consider is an extreem request as a good friend

    in reply to: ABB Drive 1800 KW capacity #11699
    admin
    Keymaster

    It's for controlling the thyristors (2 per each phase)  each allowing for half cycle pass and the other reversed to pass the negative half cycle.

    the adv. is speed control over this drive (it's generally put in wells) to control the flow.

    third harmonic is blocked because of delta connection in primary.

    in reply to: Best electrical calculation software review #11690
    admin
    Keymaster

    Adrian said:

    PowerCad-5 electrical design software ticks all the boxes plus includes, Schneider, Terasaki, NHP, GE switchgear


    PowerCad-5 is good but does not include the latest range of Schneider equipment so we often have to use Ecodial when using the NSX style breakers

    in reply to: Switch Capacitor bank, power factor correction #11689
    admin
    Keymaster

    capacitor bank should be connected o main power supply and have rouls and function to estmaite what is exact capacity and should be sets not connected one stage it must be connected step by step as per connected load, and all switch gear manufacturer brand name asembed capacitor ban.

     

    R.Saadoun

    Consultant electrical engineer

    in reply to: Economic Dispatch Problem 2 #11684
    admin
    Keymaster

    the economic dispatch problem and the variable load f=problems are infleunced by energy market,policy and legislation economics politics.

    in reply to: Economic Dispatch Problem 2 #11683
    admin
    Keymaster

    the problem of economic dispatch is serous especially in scenarios where the demand is far greater that supply because you do not have any optionm,thus may resort to load shedding or peak power shaving.also from the concept of peak and base load power stations,this is no longer true in the above scenario to my understanding because you can not apply energy the economics because with the current set up of electrcity price regulatuion the criterion become unfeasible.