Forum Replies Created
-
AuthorPosts
-
admin
Keymasterthanks a lot 4 the replay
admin
Keymasteradmin
KeymasterA.Albalooshi said:
HI,
im looking for links or book talking about electrical installation ?
admin
Keymasteri want to multiple choice question of transformer dc motor dc generator speed control etc.
admin
Keymasterhi i want to know each and every thing about this software but please provide easy access to know and install this software.
admin
KeymasterI THINK THE SOFTWARE IS A GOOD IDEA, IS IT ALSO APPLICABLE FOR SIMPLE RESIDENTIAL BUILDIND ELECTRICAL DESIGN AND LOAD CALCULATIONS?
admin
Keymasterharmonics is because of presence of undistributed winding in the generator and improper winding design(one conductor under different poles).In the transmission line switching causes harmonics may occur.
admin
KeymasterYasin said:
by the way, my country is Turkey :)
Now a days in India, in Mumbai distribution APFC's are used to maintain P.F , in RSS depending upon the requirement capacitor banks are installed to improve the pf at transmission level. But due to some industries the power factor reduces which increases line current and some drop in voltage, depending upon the requirement they are charged and discharged. HT consumer's are penalized for the p.f if it goes below 0.98 and a compensation is given if thy maintain p.f more than 0.99.
admin
KeymasterI'll need a copy of the software, please.
P.O Box: 566
Ede, Osun State
Nigeria.
Thank you.
admin
KeymasterDear Friend,
Thanks for the replay,
IF U don't mind, Can U explain about the above answer. please consider is an extreem request as a good friend
admin
KeymasterIt's for controlling the thyristors (2 per each phase) each allowing for half cycle pass and the other reversed to pass the negative half cycle.
the adv. is speed control over this drive (it's generally put in wells) to control the flow.
third harmonic is blocked because of delta connection in primary.
admin
KeymasterAdrian said:
PowerCad-5 electrical design software ticks all the boxes plus includes, Schneider, Terasaki, NHP, GE switchgear
PowerCad-5 is good but does not include the latest range of Schneider equipment so we often have to use Ecodial when using the NSX style breakers
admin
Keymastercapacitor bank should be connected o main power supply and have rouls and function to estmaite what is exact capacity and should be sets not connected one stage it must be connected step by step as per connected load, and all switch gear manufacturer brand name asembed capacitor ban.
R.Saadoun
Consultant electrical engineer
admin
Keymasterthe economic dispatch problem and the variable load f=problems are infleunced by energy market,policy and legislation economics politics.
admin
Keymasterthe problem of economic dispatch is serous especially in scenarios where the demand is far greater that supply because you do not have any optionm,thus may resort to load shedding or peak power shaving.also from the concept of peak and base load power stations,this is no longer true in the above scenario to my understanding because you can not apply energy the economics because with the current set up of electrcity price regulatuion the criterion become unfeasible.
-
AuthorPosts