Forum Replies Created
-
AuthorPosts
-
KatyParticipant
Thanks all for your help. I had contacted an engineering office to design the installation we need regarding the specifications of the standards in France and the charging capacity we would like to have. M.A you said for the poles you designed the MCB and RCD were included in the charger? Which brand will you recommend then?
2011/01/21 at 3:42 pm in reply to: Need help : project from my Town Hall to install charging stations for electric vehicle #11740KatyParticipantDuring some research in the web, I saw this project in the USA http://redmondcity.blogspot.com/2011/01/electric-vehicle-charging-stations-are.html
Does anymone from the forum lives in the USA and know about those projects?
2011/01/21 at 11:14 am in reply to: Need help : project from my Town Hall to install charging stations for electric vehicle #11739KatyParticipantIs there anyone else who had the same type of project, installing charging stations for electric vehicles?
2011/01/21 at 11:14 am in reply to: Need help : project from my Town Hall to install charging stations for electric vehicle #11580KatyParticipantYou are right, we didn't think about the power supply. Once we have decided what we need for our installation, we should focus on that point.
2011/01/17 at 11:38 am in reply to: Need help : project from my Town Hall to install charging stations for electric vehicle #11743KatyParticipantHello Serhiy,
No, the project is not about alternative electricity source, but about implementing charging stations for Electric cars. In my country it's the new trend in transportation, to have electric cars, and we need to install infrastructures to charge the cars in the city.
Do you have projects like this one in Ukraine?
Is there soemone else who had to deal with a similar project?
2011/01/13 at 9:59 am in reply to: Need help : project from my Town Hall to install charging stations for electric vehicle #11730KatyParticipantHi Ryabov Serhiy,
Thank you very much for your advice.
In the city, we have 30 000 inhabitants and 15 000 cars. People mainly work out of town, and take the train to go to the bigger city 30km ahead. So we are thinking of installing 1 station with 2 terminals and 4 charging points on the car park of the train station. And we will install 1 terminal with 2 charging points in the car park in front of the city hall, where the market takes place.
From the information we got during the fair, i have doubts on the electric architectures we need to put in place for those 2 stations? Some say we should have a dedicated panelboard , others taht the specific equipments for measurement or protection should be included in the existing switchboard? … And they are even other manufacturers that recommend that all the protection should be in the charging terminal and not in the switchboard? But I am not sure what is best to get an effective protection?
-
AuthorPosts