Participantpjarina
ParticipantThat’s why there’s pre-qualification requirements during bidding to discourage cheaters. Submittal drawings are required during procurement to keep contractors from cheating.
2012/04/30 at 12:55 pm in reply to: Create a simple on-line calculator to evaluate cost savings obtained with Power Factor correction #129382012/04/29 at 3:07 pm in reply to: Create a simple on-line calculator to evaluate cost savings obtained with Power Factor correction #12933pjarina
ParticipantWhat happens to the power factor capacitors, if the magnetic starters in the motor control centre are converted to VFD’s?