hi in my own humble opinion in other to restore the system back in a good working condition i think that first of all u have to re acess the loads carry out a load shedule then distribute your loads accordinly then do your load calculations to determine the actual cable size for each load then proceed to identify the under sized load cables remove and replace them with the normal guage and dont forget to distribute ur loads properly in the db