Hi Guys
I need you help to solve the following problem.
“IAM ON THE FINAL STAGE IN DESIGNING ELECTRICAL INSTALLATION OF A 23 STOREY BUILDING BUT IM FACED WITH THE
FOLOWING PROBLEMS
1: THE AVARAGE LOAD IS APPROX 815kVA AND THE CLIENT WANTS TWO GENERATORS OF 500kVA BUT HE DOESN WANT SYCHRONIZATION
2: HOW TO LOCATE THE CENTRE OF THE LOAD IN THAT BUILDING i.e HOW TO CALCULATE CENTRE OF THE LOAD .
3: I NEED EXPLATION ABOUT DISTRIBUTION PILLAR AND RING MAIN UNIT AND AT WHAT PLACE DO THEY REQUIRED “
N.B I have decide to use BUS BAR RISER IN MY DESIGN
Any one with the help i wl be very glad to get your suggestations
Ally
United Rebublic of Tanzania