For electrical control panels, are you using (or specifying) pre-wired components?

Do you use pre-wired components for POWER connections?

  • Yes
  • No, I don't know these components
  • No, existing products are not practical
  • No, existing products are not adapted to my control panels' architecture
  • No, existing products are not reliable
  • No, they are not useful for me
  • No, they are too expensive
  • No, they are not available at my distributor
  • Do you use pre-wired components for CONTROL connections?.

  • Yes
  • No, I don't know these components
  • No, existing products are not practical
  • No, existing products are not adapted to my control panels' architecture
  • No, existing products are not reliable
  • No, they are not useful for me
  • No, they are too expensive
  • No, they are not available at my distributor


  • This month we present you one of our forum moderators: Alen Matanovic, Engineer
    .

  • Recent graduate from ETFOS (Croatia)
  • VI degree of Power Engineering
  • Interested in Electrical Engineering Forums
  • Link to Alen's profile on the forum

    If you would like to become a moderator yourself, you can tell us by mail.

     
    Download the Load Shedding guide!

    This month, we propose you a new way to exchange added-value information, which already exists on a number of blogs & forums: the possibility to download a valuable guide (17 pages), in exchange to your answers to a short questionnaire (4 questions, 30 seconds).

    This first example is a guide about Load-Shedding functions & potential business. Here is what the pop-up will say (you can download the guide after answering the questionnaire directly from here!):

    You are an electrician or contractor?

    You would like to boost your business by 20% (on the panel board), in residential & small commercial buildings?

    Click here to download your free copy of the Load-Shedding guide

    We also started a dedicated forum topic, where you can learn more about load-shedding by sharing your views and questions on the subject.

    As usual, don't hesitate to give us by mail your feedback about this new way to provide valuable information on our community.

    Blog moderator team

    Forum topics with no answer yet !

    We need your help !

    If you can answer one of the questions below, just take 5 minutes to do it : the person asking may become the one to answer YOUR questions in the future !

    1. Smartgrids
    2. Transformer losses
    3. How do use electric heating capacitor?
    4. Power Transformer
    5. Power factor improvement
    6. Transfer kwh meters from sub1 to sub 2
    7. How to calculate the Vo(dc) of a fullwave bridge rectifier with n smoothing capacitor? and also how to find the smoothing capacitor value?

    Thanks in advance for your active contribution to our community

    Moderators team

    News Forum of the month

    We have more and more people who register to become members of our community forum:

    • already 5650 members
    • which means 500 more members in one month
    • 317 topics, for a total of 1106 posts


    © 2009 - Engineering.electrical-equipment.org

    Electrical engineering Blog meeting the recommendations for automated processing implemented in the context of e-mails by the Commission Nationale de l'Informatique et des Libertés (CNIL) of Act 78-17 of 6 January 1978 on computers, files and freedoms. We especially invite you to read the specifics of the CNIL corresponding to the use of emails professionals have enabled us to send you this letter so totally legal. The information contained in this email or capitalized by the tracking system used in this shipment will not be sold to third parties without your permission. In addition, you maintain access to your information. You can at any time terminate your subscription.