Topic RSS
Can anyone tell me if there is a standard or procedure for proving dead the conductors of a motor for the following systems, both unearthed marine systems.
Testing I assume will differ to that of an earthed system?
LV unearthed system
HV unearthed system
Due to no earth reference within IT systems is a between phases test the only type required? Proving obviously before and after or would I require to test any other way?
Most Users Ever Online: 93
Currently Online:
22 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Top Posters:
Spir Georges GHALI: 150
electricalexpert65: 33
Chris2011: 32
jatin333: 28
Ally Kanyondo: 28
Francois: 22
Member Stats:
Guest Posters: 784
Members: 11797
Moderators: 4
Admins: 1
Forum Stats:
Groups: 1
Forums: 2
Topics: 645
Posts: 2299
Newest Members: soha, ekrem.kolu, kc_5110, tonmoy, rajesh choudhary, mithlesh pandit
Moderators: Laurent (54), Sudeep (18), Nawaz (12), erickench (38)
Administrators: admin (18)
Electrical engineering Community is proudly powered by
WordPress
Entries (RSS)
and Comments (RSS)
and license