zin win aye said:
Do somebody knows about the power management system? There will be 3 generator connect parallel and the capacity will not be the same. The load sharing will be requirements.
You are speaking about the PMS. Which one do you mean? Their are several Power Management Systems. Like Gensys, Deif, Praxis, Symap, Solcon, Basler, Woodward. Most of them can handle a different capacity/size of the generators and share the load equally when they are running in parallel.